01The brief
A 300 t ladle back in service before the spring campaign
The client's basic-oxygen shop ran three ladles. One had cracked trunnion bosses, and the reline slot was fixed: miss it and the shop would run on two ladles through the summer.
We took the ladle shell in on a heavy-haul trailer, cut out both trunnion assemblies and replaced them with new forged trunnions and cast bosses from our own melt shop. The shell was stress relieved in one piece in our largest furnace before final machining.